Deliverables

Certain technical project deliverables are to be made public throughout the project. Here is a list of titles. Please contact us for more information.

Work Package 2 Software Infrastructure:

  • D2.3 Certification Needs in the Target Industrial Domains (M6)
  • D2.4 Initial designs of the innovative RTOS features for manycore processors (M12)
  • D2.5 Design of the innovative RTOS features for manycores (with evaluations) (M18)
  • D2.7 Analysis of benchmark based evaluation for COTS multicore solutions (M18)
  • D2.8 Preliminary Certification Arguments (M18)
  • D2.9 Certification approach supported by DREAMS and PROXIMA (M18)
  • D2.10 Consolidated designs of the innovative RTOS features for manycores (with evaluations) (M36)
  • D2.11 Final user manual for the industry-ready RTOS multicore solutions (M36)
  • D2.12 Evaluation report on research-oriented software-only multicore solutions (M36)
  • D2.13 Consolidated certification arguments (M36)

Work Package 3 Probabilistic Analysis and Tools:

  • D3.1 Report on abstract models (M6)
  • D3.4 Interim report on probabilistic analysis for mixed criticality on multicore (M18)
  • D3.5 Interim report on probabilistic analysis for mixed criticality on manycore (M18)
  • D3.8 Final report on probabilistic analysis for mixed criticality on multicore (M36)
  • D3.9 Final report on probabilistic analysis for mixed criticality on manycore (M36)
  • D3.10 Analysis lessons learnt from the case studies (M36)

Work Package 4 Case studies:

  • D4.7 Final definition of State of Play in the use of Multicores in Real-Time Industry (M18)